Deck, fence and pool permits

Zoning and setback checks first, then site and structural drawings, filing and comment responses. Licensed architects and engineers in-house since 1999.

A dark two-level deck stepping down to the lawn beside a white clapboard house
Typical first review2–8 weeksDMV jurisdictions12Drawn and stampedIn-house since 1999

Deck, Fence & Pool Permits, explained

Deck, fence and pool permits without the setback surprises.

Outdoor projects look simple until zoning, utilities, setbacks, lot coverage, structural loads, barriers, and environmental rules meet on the same plan. A deck ledger or retaining wall is a structural design question; a fence or pool is often a zoning and safety question; and work near an easement, floodplain, Resource Protection Area, or historic district may need another approval before the building permit can issue.

Review times

Deck, Fence & Pool Permits review times by jurisdiction

Typical first review for a deck, fence or accessory structure, from each office's published figures. Where an office publishes no figure for that, its closest path is shown and named. Fairfax County, Arlington and Montgomery County figures last verified August 10, 2026. Fewer comment rounds is the part you control.

  • Fairfax County3–6 weeks
  • Arlington2–5 weeks
  • Montgomery County4–8 weeks
  • Loudoun County (County Typical Deck / Basement Finish)1–2 weeks
  • Howard County2–6 weeks
  • Baltimore County2–6 weeks

Deck, Fence & Pool Permits

When you need it

  • Decks, porches and stairsBuilding or replacing a deck, porch, patio structure, balcony, or exterior stair
  • Fences, pools and spasInstalling a fence, swimming pool, spa, or required safety barrier
  • Retaining walls and gradingConstructing a retaining wall or changing grades and drainage near a property line
  • Covered decks and sunroomsAdding a sunroom, screened porch, pergola, or roof over an existing deck
  • Unpermitted outdoor workCorrecting outdoor work built without a permit or outside an approved footprint

Deck, Fence & Pool Permits

What the service covers

PermitCare handles zoning and setback checks, site and structural drawings, professional review, permit applications, and correction responses for decks, porches, fences, patios, pools, spas, retaining walls, and related residential improvements.

A tall horizontal slat wooden fence above a low concrete wall
Fence heightsFairfax County zoning caps fences at 4 ft in front yards and 7 ft in side and rear yards on most lots.

Documents

Documents usually required

  1. A current plat, survey, or approved site plan showing property boundaries
  2. Project dimensions, height, materials, equipment, and distance from lot lines
  3. Manufacturer information for pools, spas, prefabricated structures, or engineered systems
  4. Photographs of the house, yard, and any existing structure being replaced
  5. Existing violation notices or permit records when the work is already in place

What we deliver

What we deliver, step by step

  1. Step 1 of 5

    Setback and overlay review

    Property, zoning, setback, easement, and overlay review before plans are finalized

  2. Step 2 of 5

    Site and structural drawings

    Site plans, structural details, elevations, and barrier or safety information

  3. Step 3 of 5

    Professional seals

    Architectural or professional engineering review and seals where required

  4. Step 4 of 5

    Permits through comments

    Building, zoning, and trade permit coordination through review comments

  5. Step 5 of 5

    Other approvals flagged

    Clear identification of HOA, utility, environmental, or historic approvals that remain outside the building permit

FAQs

Deck, Fence & Pool Permits questions

Does replacing a deck require a new permit?

Usually, especially when the ledger, posts, beams, footings, guard, or stair is replaced. Replacing deck boards in kind may be maintenance, but structural replacement is normally reviewed as permitted construction.

Do fences require building permits?

It depends on the jurisdiction. Fairfax County generally needs no building permit for a fence, but zoning caps the height at 4 ft in front yards and 7 ft in side and rear yards on most lots. Montgomery County requires a permit for any new fence, and caps height at 6 ft 6 in. D.C. requires a fence permit except for repair in kind; a like-for-like replacement under 7 ft, wholly on your property, can use an Instant Permit. Pool barriers and historic districts add their own rules everywhere. A fence may need zoning approval even when a building permit is not required.

When does a retaining wall need engineered drawings?

Height, surcharge loads, slopes, property-line location, and local thresholds control the answer. A wall supporting a driveway, structure, or steep grade often needs engineering even when a low landscape wall does not.

Can HOA approval replace a county permit?

No. HOA or condominium approval is a private requirement, while the permit is governmental approval. Many projects need both, and one does not guarantee the other.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Send the address and a sketch or photo.

We'll check the setbacks and tell you what the permit needs.