Fairfax County permit expediter

We draw, stamp and file your building permit in Fairfax County PLUS, then answer every reviewer comment until it issues. Licensed architects and engineers in-house since 1999.

Aerial view over a leafy Fairfax County cul-de-sac with a new foundation poured on one lot
Residential Addition / Alteration4–8 weeksWhere we fileFairfax PLUSVerifiedAugust 10, 2026

Review times

Fairfax County building permit review times

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is.

  • Residential Addition / Alteration4–8 weeks
  • Commercial Tenant Improvement6–12 weeks
  • New Commercial Construction10–16 weeks
  • MEP (Mechanical / Electrical / Plumbing)2–5 weeks
  • Deck / Fence / Accessory Structure3–6 weeks

What we file

Building permits we file in Fairfax County

  • Residential addition and basement finishAdditions, structural alterations and finished basements, drawn and stamped in-house.
  • Commercial tenant fit-outPartitions, ceilings, lighting and MEP for offices and retail, with accessibility review.
  • Deck, fence, and pool permitsIncluding same-size deck replacements, which still need a permit in Fairfax County.
  • MEP permits (HVAC, electrical, plumbing)Trade permits filed alongside the building permit so the sets agree.
  • Home occupation permitsZoning approval to run a business from a home in the county.
  • Solar panel installationRoof-mounted systems with the structural and electrical sheets reviewers ask for.
  • ADA compliance retrofitsRamps, restrooms and entrances brought up to current accessibility standards.
Suburban backyards in Fairfax County seen from above, one with a new pool and concrete deck
Pools, decks and fencesSame-size deck replacements still need a Fairfax County permit.

Local rules

Before you file a building permit in Fairfax County

Fairfax County is the most populous jurisdiction in Virginia, and its Department of Land Development Services processes thousands of permits annually. Applications now begin in the county's Planning and Land Use System (PLUS), where applicants submit records, upload documents, pay fees, and track status. Navigating PLUS alongside Fairfax's zoning overlays and Historic Area requirements takes careful front-end preparation.

Fairfax County uses PLUS as its central platform for building, zoning, permitting, and other land-development records. Applications, fees, documents, notifications, and status tracking run through PLUS. Select the correct record type from the county's Permit Library before uploading plans; using legacy ePlans instructions can send an applicant down the wrong path.

Common comments

Why Fairfax County permits get sent back

  • Insufficient setback documentation
  • Missing energy compliance worksheets
  • Incorrect zoning district references
  • Incomplete site plans

We pre-check every package against the office's requirements before it is filed.

Service area

Fairfax County communities we cover

  • Annandale
  • Burke
  • Centreville
  • Chantilly
  • Fairfax Station
  • Great Falls
  • Lorton
  • McLean
  • Mount Vernon
  • Oakton
  • Reston
  • Springfield
  • Tysons

The City of Fairfax and the City of Falls Church are independent cities with their own permit offices.

Step by step

How to get a building permit in Fairfax County

  1. Step 1 of 6

    Check zoning first

    Confirm setbacks, lot coverage and any overlay district (Route 1, Route 7, Tysons or a Historic Area) before anything is drawn.

  2. Step 2 of 6

    Pick the right record type

    Choose it from the county's Permit Library. Old ePlans instructions send applicants down the wrong path.

  3. Step 3 of 6

    Prepare a complete package

    Site plan with setback distances, floor plans, elevations and the energy compliance worksheets.

  4. Step 4 of 6

    Submit and pay in PLUS

    Create the record, upload plans and documents, and pay fees in the Planning and Land Use System.

  5. Step 5 of 6

    Answer reviewer comments

    Each correction round can add weeks. We respond to every comment until the permit issues.

  6. Step 6 of 6

    Pass inspections

    Schedule inspections in PLUS and close the permit out once the work is approved.

FAQs

Fairfax County permit questions

How do I apply for a building permit in Fairfax County?

Fairfax County requires applications to begin in the Planning and Land Use System (PLUS). Applicants create the appropriate record, upload plans and supporting documents, pay fees, receive notifications, and track status through PLUS. The county says PLUS replaced its legacy FIDO, PAWS, and ProjectDox systems beginning October 31, 2022.

How long does a residential permit take in Fairfax County?

Residential additions and alterations typically take 4–8 weeks for initial plan review. First-time submissions with errors can take longer. PermitCare pre-checks packages against the county's checklist and common comment types to cut correction rounds.

Does Fairfax County require permits for deck replacements?

Yes. Any deck replacement, including same-size, same-location replacements, requires a building permit in Fairfax County unless you are only replacing deck boards in kind. A permit ensures the structural connections to the house meet current code.

What are common reasons for permit rejections in Fairfax County?

Common issues include insufficient setback documentation, missing energy compliance worksheets, incorrect zoning district references, and incomplete site plans. PermitCare pre-checks all submissions against Fairfax County's checklist before filing.

Does Fairfax County have any special zoning overlays?

Yes. Fairfax County has several overlay districts, including the Route 1, Route 7, Tyson's Corner, and various Historic Area overlays, that impose additional design and use restrictions. Properties in these zones require additional review steps.

Can PermitCare help with Fairfax County code violations?

Yes. PermitCare regularly handles code violation permit pulls in Fairfax County: obtaining after-the-fact permits for work done without proper authorization, preparing corrective drawings, and navigating the compliance process with the county.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Fairfax County?

Send the address and scope. We'll call within one business day with the Fairfax County permit path, a review range and a price.