Permit Drawing Adjustments
When you need it
- Comments need drawing changesA reviewer issued comments that require drawing changes rather than a written explanation
- Field conditions differThe field condition differs from the approved or original drawings
- Incomplete contractor setA contractor or draftsperson prepared a set that lacks required details or coordination
- Scope changedThe scope changed after submission and must be revised before approval or inspection
- As-builts to correctionsAs-built documents need to be converted into a permit-ready correction package







