Wet stamp services

Licensed architect and engineer review with wet-stamped originals for authorities, lenders and owners that require them. Licensed architects and engineers in-house since 1999.

A round seal dropping toward a drawing sheet beside an open blue ink pad
DMV jurisdictions12Drawn and stampedIn-house since 1999

Wet Stamp Services, explained

Original signed seals when a copy won't do.

A wet stamp is an original professional seal and signature placed on a physical document after a licensed architect or professional engineer has reviewed and accepted responsibility for the work. It is not a shortcut for unreviewed plans. The professional must have enough project information to evaluate the design, require corrections where necessary, and seal only work within the professional's discipline and licensing authority.

Wet Stamp Services

When you need it

  • Authority requires paperThe permitting authority specifically requires an original signed and sealed paper set
  • Third party needs originalsA lender, owner, landlord, manufacturer, or project record requires physical originals
  • Digital seals not acceptedDigitally sealed documents are not accepted for the specific filing or closeout process
  • Existing drawings to certifyExisting drawings need professional review before they can be certified
  • Reviewer asks for a sealA review comment asks for a licensed architect or engineer to take responsibility for part of the design

Wet Stamp Services

What the service covers

When an authority, lender, owner, or project record requires an original signed professional seal rather than a digital certification, PermitCare coordinates document review by the appropriate licensed architect or professional engineer and supplies wet-stamped originals for approved scopes.

A drawing set tied with string resting in a kraft envelope on a concrete ledge
Paper originalsMany online systems accept digital seals, while some paper filings and third parties still request originals.

Documents

Documents usually required

  1. The complete drawing set in a clear, printable format
  2. Project address, jurisdiction, scope, and intended use of the sealed documents
  3. Calculations, product data, surveys, and existing-condition information relevant to the design
  4. The authority's request or comment identifying what must be sealed
  5. Editable source files when corrections are likely to be required

What we deliver

What we deliver, step by step

  1. Step 1 of 5

    The right professional

    Discipline and jurisdiction screening to confirm the correct licensed professional

  2. Step 2 of 5

    Substantive review

    Substantive review of the plans, calculations, details, and project conditions

  3. Step 3 of 5

    Correction list

    A written correction list when documents are not ready to be sealed

  4. Step 4 of 5

    Original seals and signatures

    Original professional seals and signatures on approved documents

  5. Step 5 of 5

    Continuity on comments

    Continuity for technical questions or plan-review comments related to the sealed work

FAQs

Wet Stamp Services questions

Can you wet stamp drawings immediately?

Only after the appropriate licensed professional has completed a real review and is satisfied with the documents. Timing depends on the scope, quality of the existing set, calculations, and whether corrections are needed.

Is a wet stamp different from a digital professional seal?

The professional responsibility is the same. The difference is the document format and signature method. Many online systems accept compliant digital seals, while some paper filings and third parties still request originals.

Can an engineer stamp architectural drawings?

Only work within the professional's licensed discipline and legal scope should be sealed. Some projects need an architect, some need one or more engineering disciplines, and many need coordinated seals from both.

Does a professional stamp guarantee permit approval?

No. A seal confirms professional responsibility for the design; the jurisdiction still reviews the project for code, zoning, documentation, and process compliance.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Tell us who requires the wet stamp and send the documents.

We'll confirm eligibility and turnaround.