Washington, D.C. permit expediter

We research, file and track your D.C. permit with the Department of Buildings, through Permit Wizard or Citizen Access and ProjectDox, until it issues. Licensed architects and engineers in-house since 1999.

Painted brick rowhouses with bay windows along a street in Washington, D.C.
Homeowner's Center (owner-occupied 1–2 family)Next business dayWhere we fileDOB Citizen AccessVerifiedAugust 10, 2026

Review times

Washington, D.C. building permit review times

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is.

  • Homeowner's Center (owner-occupied 1–2 family)Next business day
  • Digital Walk-Through (eligible scopes under 1,000 sq ft)Next business day
  • Solar Review15 business days
  • Filed Projects (full plan review)30 business days
  • Historic (HPRB major work)+30–60 days

What we file

Building permits we file in Washington, D.C.

  • Residential alterations and additionsOwner-occupied 1–2 family homes can use the Homeowner's Center; additions take full filed review.
  • Commercial tenant layout and build-outSmall scopes may qualify for Digital Walk-Through; larger layouts take the 30-business-day review.
  • New construction and additionsDOB's 30-business-day filed review, plus sister-agency sign-offs on their own clocks.
  • Trade permits (electrical, plumbing, mechanical)Issued only to licensed, bonded master trade professionals.
  • Solar and raze/demolition permitsSolar review takes 15 business days; demolition under 1,000 sq ft can qualify for Digital Walk-Through.
  • Historic district approvals (HPO/HPRB)Most clear staff-level HPO review; HPRB cases add 30–60 days or more.
  • Certificates of OccupancyFiled with DOB for new uses and changes of use, coordinated with the building permit.
  • After-hours and supplemental permitsFor work outside permitted hours and for changes to a permit already issued.
A new wooden privacy fence along a brick alley behind D.C. rowhouses
Next-day small projectsFences and projects under 1,000 sq ft can get next-day Digital Walk-Through review.

Local rules

Before you file a building permit in Washington, D.C.

Washington D.C.'s Department of Buildings (DOB), split from the old DCRA in 2022, runs a fully electronic permit process with published service-level timelines, from next-business-day reviews for small residential projects to 30-business-day reviews for full filed projects. Between Permit Wizard, Citizen Access, ProjectDox, historic review, and sister-agency sign-offs, the District rewards applicants who know the system. PermitCare does.

D.C. currently enforces the 2017 DC Construction Codes (2015 I-Codes with District amendments); an update to 2024-based codes is underway with adoption targeted around 2027. DOB's published timelines cover DOB review only. DDOT public-space, DC Water, DOEE, and WMATA sign-offs run on their own clocks and are usually the real schedule risk on larger projects.

Common comments

Why Washington, D.C. permits get sent back

  • Project filed in the wrong review track
  • Missing historic preservation clearance
  • Missing energy and green code documents
  • Pending DDOT, DC Water or WMATA sign-offs
  • Trade work without a licensed master trade

We pre-check every package against the office's requirements before it is filed.

Service area

Washington, D.C. neighborhoods we cover

  • Adams Morgan
  • Anacostia
  • Brookland
  • Capitol Hill
  • Columbia Heights
  • Dupont Circle
  • Georgetown
  • H Street
  • Logan Circle
  • Navy Yard
  • Petworth
  • Shaw
  • Tenleytown
  • Woodley Park

DOB issues building permits for the whole District, including Chevy Chase D.C. and Takoma D.C.; the Maryland sides of those neighborhoods file in Maryland.

Step by step

How to get a building permit in Washington, D.C.

  1. Step 1 of 6

    Research the lot in Scout

    Check zoning, historic status and flood hazard for the property in DOB's Scout tool before drawings start.

  2. Step 2 of 6

    Choose the review track

    Homeowner's Center, Digital Walk-Through, solar or full filed review. The track sets the clock.

  3. Step 3 of 6

    Clear historic review

    Most historic district work clears staff-level HPO Expedited Review; major alterations go to the HPRB.

  4. Step 4 of 6

    Apply and upload plans

    Permit Wizard for small residential work, Citizen Access for larger projects, with drawings uploaded to ProjectDox.

  5. Step 5 of 6

    Answer DOB and agency comments

    We answer DOB's comments and chase DDOT, DC Water, DOEE and WMATA sign-offs, which run on their own clocks.

  6. Step 6 of 6

    Line up licensed trades

    Electrical, plumbing and mechanical permits go only to licensed master trades. We coordinate them with the building permit.

FAQs

Washington, D.C. permit questions

How do I apply for a building permit in Washington D.C.?

Start with DOB's Scout tool to check zoning, historic status, and flood hazard for the property; then apply through Permit Wizard (small residential) or the Citizen Access portal (commercial and larger projects), and upload drawings to ProjectDox for electronic plan review. PermitCare runs this entire workflow: property research, application, plan upload, and comment responses.

How long does DOB plan review take?

DOB publishes service-level agreements: next business day for Homeowner's Center and Digital Walk-Through reviews, 15 business days for solar, and 30 business days for fully filed projects, covering DOB's review only. Sister agencies (DDOT, DC Water, DOEE, WMATA) add time. PermitCare scopes projects into the fastest eligible review path.

What qualifies for D.C.'s next-day Digital Walk-Through review?

DOB lists the eligible work on its plan review page: projects under 1,000 sq ft (including interior renovations and demolition), fences, signs, retaining walls, soil borings, underground storage tanks and tents. Review takes one business day. Larger or more complex work goes through full filed review. We check eligibility against DOB's list before drawings start.

My property is in a historic district. What changes?

Permit applications on historic property need preservation clearance. Over 95% clear through staff-level HPO Expedited Review, often same-day for minor conforming work; major alterations go to the Historic Preservation Review Board, adding 30–60 days or more. PermitCare prepares historic submissions to qualify for the expedited path wherever possible.

Can homeowners pull their own trade permits in D.C.?

No. Electrical, plumbing, and mechanical permits are issued only to licensed, bonded master trade professionals. Building permits for owner-occupied one- and two-family homes can go through DOB's Homeowner's Center. PermitCare coordinates licensed trades and their permits as part of a full permit package.

Is there a way to expedite a large D.C. project?

Yes. DOB's paid Accelerated Plan Review program convenes all reviewing parties in scheduled sessions and issues permits within a business day of final approvals, at significant cost. DOB also certifies third-party plan reviewers whose reviews can shorten the standard path. We can advise which route pencils out for your project.

Does D.C. have green building requirements?

Yes. Private development of 50,000+ sq ft must achieve at least LEED certification under the Green Building Act, and net-zero energy code requirements are phasing in under the Clean Energy DC law. Energy and green code compliance documentation is part of the permit package PermitCare prepares.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Washington, D.C.?

Send the address and scope. We'll call within one business day with the Washington, D.C. permit path, a review range and a price.