Residential building permits

Additions, alterations, new homes and demolition. Drawings, zoning checks, stamps and filing from one in-house team.

A new timber-framed addition rising behind an older painted brick house
Typical first review2–10 weeksDMV jurisdictions12Fastest: eligible residentialFrederick County, 1 business day

Residential Permit, explained

Residential permits, filed and tracked to approval.

A residential permit is the approval your county or city issues before you build, add on to, alter, or tear down a house. Most homeowners meet the process for the first time when a contractor says the job cannot start without one, and most are surprised by how much of the work happens before anything is submitted. The drawings have to show setbacks, structure, and energy compliance in the format that particular jurisdiction expects. Get that part wrong and the application comes back with comments, which restarts the review clock rather than pausing it.

Review times

Residential Permit review times by jurisdiction

Typical first review for a residential addition or alteration, from each office's published figures. Where an office publishes no figure for that, its closest path is shown and named. Fairfax County, Arlington, Alexandria, Montgomery County and Washington, D.C. figures last verified August 10, 2026. Fewer comment rounds is the part you control.

  • Fairfax County4–8 weeks
  • Arlington3–6 weeks
  • AlexandriaVaries by scope and review disciplines
  • Montgomery County4–10 weeks
  • Loudoun County2–6 weeks
  • Prince William County2–6 weeks
  • Stafford County2–6 weeks
  • Howard County3–8 weeks
  • Frederick County (Eligible Residential)1 business day
  • Prince George's County3–8 weeks
  • Baltimore County3–8 weeks
  • Washington, D.C. (Homeowner's Center)Next business day

Residential Permit

When you need it

  • New homesBuilding a new house, a custom build, or a second dwelling on the lot
  • AdditionsAdding square footage: an addition, a dormer, an enclosed porch, a garage
  • Structural changesStructural alteration: removing or moving a load-bearing wall, changing the roof line, underpinning a basement
  • DemolitionDemolition, in whole or in part, including most detached-structure teardowns
  • DecksReplacing a deck, and in many jurisdictions repairing one if you touch the ledger, posts, or footings
  • Proof for a saleAny work a lender, insurer, or buyer will later ask you to prove was permitted

Residential Permit

What the service covers

Residential building new construction, custom-build, addition, alteration, and demolition permits. We work directly with the reviewing county or city office and answer every comment until the permit is approved.

Fresh timber rafters of a raised roof line above an older house
Roof linesChanging the roof line is a structural alteration, so it needs a residential permit.

Documents

Documents usually required

  1. A site or plat plan showing the structure, lot lines, and setbacks
  2. Floor plans and elevations for the proposed work
  3. Structural details for anything load-bearing, sealed by a professional engineer where required
  4. Energy compliance worksheets, commonly ResCheck for residential scopes
  5. Proof of ownership or an owner authorization letter if a contractor is filing
  6. Contractor license and, where the jurisdiction requires it, a certificate of insurance

Where we file

Every DMV office we file in

What we deliver

What we deliver, step by step

  1. Step 1 of 6

    Drawings to the checklist

    Permit drawings prepared to the submitting jurisdiction's checklist, or a review and correction of drawings you already have

  2. Step 2 of 6

    Zoning and setbacks first

    Zoning and setback verification before submission, which is where most residential rejections come from

  3. Step 3 of 6

    Energy compliance

    Energy compliance documentation where the jurisdiction requires it

  4. Step 4 of 6

    Filing and tracking

    Application filing, fee handling, and tracking through the portal

  5. Step 5 of 6

    Every comment answered

    Written responses to every plan review comment, and resubmission until approval

  6. Step 6 of 6

    Inspections to final

    Inspection scheduling and coordination through to final sign-off

FAQs

Residential Permit questions

How long does a residential building permit take?

It depends entirely on the jurisdiction and how clean the submission is. Simple over-the-counter scopes can be same-day in some offices, while a full addition commonly runs several weeks of plan review before a single comment is answered. The variable you control is the completeness of the package: each round of comments adds another full review cycle, so most of the time people lose is spent on avoidable corrections rather than on the county's queue.

Do I need a permit to replace a deck?

Usually yes. Most DMV jurisdictions treat a deck replacement as new construction rather than maintenance, and several require a permit for any deck attached to the house regardless of size. Swapping deck boards in kind is often exempt, but replacing the ledger, posts, or footings generally is not. The thresholds differ by county, so check the jurisdiction page for the one you are building in.

Can I pull my own permit as a homeowner?

In most jurisdictions yes, if you own and occupy the home. The permit is not the hard part. Producing drawings that pass plan review the first time, and answering code comments in the reviewer's language, is what usually sends homeowners looking for help after the second round of corrections.

What happens if I build without a permit?

The common outcomes are a stop-work order, a fee penalty that is often a multiple of the original permit cost, and a requirement to open finished work back up so it can be inspected. It also surfaces at sale, when the buyer's agent or lender asks for permit history. Unpermitted work can usually be legalized after the fact, which is a code violation case rather than a normal permit.

Do I need an architect or engineer for a residential permit?

For structural work, most DMV jurisdictions require drawings sealed by a licensed architect or professional engineer. PermitCare has both in house, so the drawings and the seal come from the same team that files the application.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Send the address and what you want to build.

We'll call with the permit path, a review range and a price.