Commercial Permit, explained

Every commercial review mapped before you file.

Commercial permitting is less a single approval than a set of parallel reviews that have to land together. Building, zoning, fire, and health each run on their own clock, and in the District and the larger Maryland counties, sister agencies like the water authority or the transportation department can drive the schedule more than the building department does. The projects that finish on time are the ones where somebody mapped every required review before submission rather than discovering the fourth one halfway through.

Review times

Commercial Permit review times by jurisdiction

Typical first review for new commercial construction, from each office's published figures. Where an office publishes no figure for that, its closest path is shown and named. Fairfax County, Arlington, Montgomery County and Washington, D.C. figures last verified August 10, 2026. Fewer comment rounds is the part you control.

  • Fairfax County10–16 weeks
  • Arlington (High-Rise Commercial Construction)8–14 weeks
  • Montgomery County10–20 weeks
  • Loudoun County8–16 weeks
  • Prince William County8–16 weeks
  • Stafford County8–14 weeks
  • Howard County8–16 weeks
  • Frederick County (New Commercial under 5,000 sq ft)~2 weeks
  • Prince George's County8–16 weeks
  • Baltimore County10–20 weeks
  • Washington, D.C. (Filed Projects)30 business days

Commercial Permit

When you need it

  • New constructionNew commercial construction, a building shell, or a core-and-shell delivery
  • Change of useChange of use or occupancy, including converting retail to restaurant or office to medical
  • Occupied building alterationsInterior alteration in an occupied building, which usually pulls in fire marshal review
  • Fire and life safetyFire exit, sprinkler, standpipe, or fire alarm work
  • Multi-family and mixed-useMulti-family, mixed-use, industrial, and institutional projects
  • Certificate of occupancyAny project where a certificate of occupancy is the milestone that lets you open

Commercial Permit

What the service covers

Commercial project planning, zoning, building construction permits, fire exit, and fire suppression system / sprinkler permits. Our architects and engineers map every agency review before submission and track each one to occupancy.

A round stone civic building with tall columns across an empty plaza
Change of useConverting retail to restaurant or office to medical is a change of use that needs a commercial permit.

Documents

Documents usually required

  1. Architectural drawings: floor plans, reflected ceiling plans, elevations, and sections
  2. Structural drawings and calculations where the scope touches structure
  3. MEP drawings, commonly filed as separate trade permits
  4. Life safety and egress plans, with occupant load calculations
  5. Energy compliance documentation, commonly COMcheck for commercial scopes
  6. A recorded plat or survey, and the lease or deed establishing the applicant's standing
  7. Fire protection drawings where sprinkler, standpipe, or alarm work is in scope

What we deliver

What we deliver, step by step

  1. Step 1 of 6

    Review map first

    A review map produced before submission: every agency, every approval, and the order they have to happen in

  2. Step 2 of 6

    Sealed permit drawings

    Permit drawings and construction document revisions, sealed by our licensed architects and engineers

  3. Step 3 of 6

    Zoning and use checks

    Zoning and use verification, including overlay districts and form-based code where they apply

  4. Step 4 of 6

    Filing across agencies

    Filing and fee handling across every agency involved, not just the building department

  5. Step 5 of 6

    Comments and resubmissions

    Plan review comment responses, resubmissions, and direct coordination with reviewers

  6. Step 6 of 6

    Inspections to occupancy

    Inspection coordination through to certificate of occupancy

FAQs

Commercial Permit questions

How long does a commercial building permit take?

Plan on months rather than weeks for anything substantial, and understand that the building department's published turnaround is only one of several clocks. Sister agency reviews run in parallel and frequently finish last. Some jurisdictions publish a service level agreement for their own review, which is useful for planning but does not cover the agencies they hand off to.

What is the difference between a shell permit and a fit-out permit?

A shell permit covers the base building: structure, envelope, and core systems, delivered without a specific tenant's layout. A fit-out permit covers what a tenant builds inside that shell. They are separate applications on separate schedules, and a fit-out generally cannot be issued until the shell has progressed far enough for the space to be defined.

Do I need a permit for interior work in a space I already lease?

Almost always, once the work touches walls, egress, or any trade system. Cosmetic work like paint and floor covering is typically exempt. Anything that moves a partition, changes the exit path, or ties into mechanical, electrical, or plumbing needs a permit, and in an occupied building it usually needs fire marshal coordination too.

Can I expedite a commercial permit?

Sometimes, and it is worth checking early because the mechanisms differ. Several DMV jurisdictions run a paid accelerated review program, and some allow certified third-party plan reviewers to shorten the standard path. Whether either is available, and whether it is worth the fee, depends on the jurisdiction and the project.

What is a certificate of occupancy and when do I get it?

It is the document that says the space is legally usable for its stated purpose. It comes after final inspections pass, and it is the milestone that actually lets you open. Chasing it at the end is the most common source of delay because it depends on every other approval having closed out cleanly.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Send the address, use and target opening date.

We'll map the reviews it needs and call within one business day.