Residential Addition / Alteration4–10 weeksWhere we fileDPS eServicesVerifiedAugust 10, 2026

Review times

Montgomery County building permit review times

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is.

  • Residential Addition / Alteration4–10 weeks
  • Commercial Tenant Improvement6–14 weeks
  • New Commercial Construction10–20 weeks
  • MEP (Mechanical / Electrical / Plumbing)3–6 weeks
  • Deck / Fence / Accessory Structure4–8 weeks

What we file

Building permits we file in Montgomery County

  • Residential additions and basement finishesAdditions typically run 4–10 weeks at DPS; most need stamped drawings and ResCheck.
  • Commercial tenant fit-outSmall interior alterations may fit Commercial Fast Track; others run 6–14 weeks.
  • New residential constructionStamped drawings and energy compliance documentation, uploaded to ePlans.
  • MEP permits (HVAC, electrical, plumbing)Separate trade applications in Apply & ePay, typically reviewed in 3–6 weeks.
  • Swimming pool and deck permitsEligible single-level decks can use Residential Fast Track, generally 1–2 business days.
  • Solar panel and EV charger permitsFiled with DPS through eServices, alongside any electrical trade permit.
  • ADA compliance retrofitsRamps, restrooms and entrances brought up to current accessibility standards.
  • Special exception applicationsZoning approval for uses a zone allows only by special exception.
A new single-level timber deck at the back of a brick house in Montgomery County
Fast Track decksEligible single-level decks can use Residential Fast Track, generally 1–2 business days.

Local rules

Before you file a building permit in Montgomery County

Montgomery County is Maryland's most populous county, and its Department of Permitting Services (DPS) is one of the busiest permit offices in the region. DPS processes tens of thousands of permits annually across a diverse mix of residential, commercial, and institutional projects, from Bethesda high-rises to Poolesville additions. PermitCare has worked Montgomery County permits since 1999.

Montgomery County DPS uses eServices for applications, payments, inspection scheduling, and status tools, with ePlans supporting electronic plan review. Rockville and Gaithersburg are independent permit jurisdictions, so the property address must be checked before filing with the county.

Common comments

Why Montgomery County permits get sent back

  • Missing ResCheck or COMcheck documentation
  • Unstamped drawings where a seal is required
  • Incomplete site plans or setback documentation
  • Scope descriptions that don't match the drawings
  • Open violations needing a Violation Removal Permit

We pre-check every package against the office's requirements before it is filed.

Service area

Montgomery County communities we cover

  • Aspen Hill
  • Bethesda
  • Burtonsville
  • Clarksburg
  • Colesville
  • Damascus
  • Germantown
  • Montgomery Village
  • North Potomac
  • Olney
  • Potomac
  • Silver Spring
  • Wheaton

Rockville and Gaithersburg are independent cities with their own permit offices, and Takoma Park requires a city municipality letter before DPS issues the permit.

Step by step

How to get a building permit in Montgomery County

  1. Step 1 of 6

    Confirm the jurisdiction

    Check the address against Rockville and Gaithersburg city limits before anything is drawn. Properties inside them do not file with DPS.

  2. Step 2 of 6

    Check the planning context

    Sector Plan areas such as Clarksburg need Planning Department coordination, and open violations need a Violation Removal Permit first.

  3. Step 3 of 6

    Prepare a stamped package

    Architect or engineer stamped drawings with ResCheck or COMcheck energy compliance documentation.

  4. Step 4 of 6

    Apply and upload

    File and pay through DPS Apply & ePay and upload plans to ePlans. Eligible small projects go through Fast Track.

  5. Step 5 of 6

    Answer ePlans comments

    Track each discipline's comments in ePlans and respond to every one until the permit issues.

  6. Step 6 of 6

    Pass inspections

    Schedule inspections through eServices and close the permit out with final inspection sign-off.

FAQs

Montgomery County permit questions

How do I apply for a building permit in Montgomery County?

Montgomery County DPS provides an eServices suite for online applications and payment, ePlans upload and comment response, inspection scheduling, permit-status checks, and records. PermitCare coordinates the appropriate eServices and ePlans steps for the permit type rather than treating them as one generic portal action.

How long does a residential permit take in Montgomery County?

Residential additions typically take 4–10 weeks in Montgomery County, depending on project complexity and current DPS workload. Complete, well-prepared submissions move faster, and PermitCare's submissions are formatted to DPS's checklist to minimize correction cycles.

Does Montgomery County require energy compliance documentation?

Yes. Montgomery County enforces the Maryland Energy Performance Standards, which require energy compliance documentation (ResCheck or COMcheck) for most residential and commercial projects. PermitCare prepares these reports as part of the permit package.

Does Montgomery County require architect or engineer stamps?

Yes. Most structural projects, new construction, and commercial work require architect or engineer stamped drawings. PermitCare's in-house Licensed Architects (RA) and Professional Engineers (PE) provide the required stamps and certification.

How does Montgomery County handle code violation permits?

Properties with outstanding DPS code violations require a Violation Removal Permit. PermitCare handles the full correction process, from initial assessment through permit approval and final inspection sign-off.

Can PermitCare help with permits in Rockville or Bethesda?

Yes. Rockville is an independent city with its own permit office. Bethesda, Chevy Chase, and most of the county fall under DPS. PermitCare serves all Montgomery County municipalities and can advise on the correct jurisdiction for your property address.

Are there special requirements for areas like Clarksburg?

Yes. Several Montgomery County communities have active Sector Plans that impose specific design requirements and require coordination with the Planning Department in addition to DPS. PermitCare is familiar with these overlapping review processes.

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Montgomery County?

Send the address and scope. We'll call within one business day with the Montgomery County permit path, a review range and a price.