Residential building permits in Fairfax County

Fairfax County residential permits begin in the Planning and Land Use System (PLUS), and the county's layered zoning overlays (Route 1, Route 7, Tysons, and multiple Historic Areas) are common sources of additional review. Even a same-size deck replacement may require a permit, and setback documentation belongs in the first submission rather than a correction round.

A brick colonial house with a new one-story addition in white siding
Residential Addition / Alteration4–8 weeksDeck / Fence / Accessory Structure3–6 weeksWhere we fileFairfax PLUS

Local requirements

What Fairfax County asks for

  • Applications, documents, fees, notifications, and status tracking through PLUS
  • Overlay districts (Route 1, Route 7, Tysons, Historic Areas) add design and use review
  • Energy compliance worksheets required with most residential submissions
  • Deck replacements require a permit unless boards are replaced in kind

Everything about permits in Fairfax County

Review times

Typical review times in Fairfax County

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Fairfax County review times

  • Residential Addition / Alteration4–8 weeks
  • Deck / Fence / Accessory Structure3–6 weeks
Stacks of timber deck boards on a concrete pad beside a house
DecksEven a same-size deck replacement needs a permit in Fairfax County unless the boards are replaced in kind.

Documents

Documents usually required

  1. A site or plat plan showing the structure, lot lines, and setbacks
  2. Floor plans and elevations for the proposed work
  3. Structural details for anything load-bearing, sealed by a professional engineer where required
  4. Energy compliance worksheets, commonly ResCheck for residential scopes
  5. Proof of ownership or an owner authorization letter if a contractor is filing
  6. Contractor license and, where the jurisdiction requires it, a certificate of insurance

Common comments

Why Fairfax County permits get sent back

  • Insufficient setback documentation
  • Missing energy compliance worksheets
  • Incorrect zoning district references
  • Incomplete site plans

We pre-check every package against the office's requirements before it is filed.

What we deliver

Residential Permit in Fairfax County, step by step

  1. Step 1 of 6

    Drawings to the checklist

    Permit drawings prepared to the submitting jurisdiction's checklist, or a review and correction of drawings you already have

  2. Step 2 of 6

    Zoning and setbacks first

    Zoning and setback verification before submission, which is where most residential rejections come from

  3. Step 3 of 6

    Energy compliance

    Energy compliance documentation where the jurisdiction requires it

  4. Step 4 of 6

    Filing and tracking

    Application filing, fee handling, and tracking through the portal

  5. Step 5 of 6

    Every comment answered

    Written responses to every plan review comment, and resubmission until approval

  6. Step 6 of 6

    Inspections to final

    Inspection scheduling and coordination through to final sign-off

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Fairfax County?

Send the address and scope. We'll call within one business day with the Fairfax County permit path, a review range and a price.