ADA Compliance in Arlington

Arlington's dense commercial corridors mean ADA compliance comes up constantly in lease turnovers and renovations. Accessibility retrofits that touch structure, entrances, restrooms, or path-of-travel need permits through CPHD, and our engineers prepare the assessment, remediation drawings, and permit filings as one package.

A glass canopy over the level entrance of a brick and glass office building
Commercial Tenant Improvement5–10 weeksHigh-Rise Commercial Construction8–14 weeksWhere we filePermit Arlington

Local requirements

What Arlington asks for

  • Accessibility gap assessment by licensed engineers before design
  • Permits filed through the CPHD portal with accessibility review
  • Path-of-travel, entrance, and restroom retrofits are the most common scopes
  • Federal rules cap required path-of-travel spending at 20% of the primary alteration's cost (28 CFR 36.403(f))

Everything about permits in Arlington

Review times

Typical review times in Arlington

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Arlington review times

  • Commercial Tenant Improvement5–10 weeks
  • High-Rise Commercial Construction8–14 weeks
A sloped concrete walkway with a steel handrail rising toward a building
Path of travelFederal rules cap required path-of-travel spending at 20% of the primary alteration's cost.

Documents

Documents usually required

  1. Existing floor plans, or as-built drawings if none exist
  2. A site plan covering parking, exterior routes, and entrances
  3. The building's occupancy classification and use
  4. Prior accessibility reports or remediation records, if any
  5. Any complaint or demand letter received

Common comments

Why Arlington permits get sent back

  • Wrong permit or record type selected
  • Missing occupancy load or egress plans
  • MEP drawings that don't match the architectural set
  • Accessibility upgrades left out of the scope
  • Use changes filed as simple fit-outs

We pre-check every package against the office's requirements before it is filed.

What we deliver

ADA Compliance in Arlington, step by step

  1. Step 1 of 6

    Accessibility survey

    An accessibility survey of the existing facility by our licensed professionals

  2. Step 2 of 6

    Findings report

    A written findings report identifying barriers and the standard each one falls short of

  3. Step 3 of 6

    Prioritized remediation plan

    A prioritized remediation plan, which matters because barrier removal is judged on readily achievable steps

  4. Step 4 of 6

    Sealed corrective drawings

    Drawings for the corrective work, sealed as required

  5. Step 5 of 6

    Remediation permits

    Permit applications for the remediation scope

  6. Step 6 of 6

    Building department coordination

    Coordination with the building department, since accessibility review runs alongside normal plan review

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Arlington?

Send the address and scope. We'll call within one business day with the Arlington permit path, a review range and a price.