Commercial building permits in Washington, D.C.

Commercial permits in the District go through DOB's Citizen Access portal with plans reviewed electronically in ProjectDox. DOB publishes service-level agreements (30 business days for fully filed projects, covering DOB's review only), and sister agencies like DDOT, DC Water, and WMATA typically drive the real schedule. Private development of 50,000+ square feet must also meet Green Building Act LEED requirements.

A new concrete tower rising behind a row of older brick and stone buildings
Filed Projects (full plan review)30 business daysWhere we fileDOB Citizen Access

Local requirements

What Washington, D.C. asks for

  • Filed projects: 30-business-day DOB review SLA; sister-agency reviews run on separate clocks
  • Paid Accelerated Plan Review program available for schedule-critical projects
  • DOB-certified third-party plan reviewers can shorten the standard path
  • 50,000+ sq ft private development must achieve at least LEED certification

Everything about permits in Washington, D.C.

Review times

Typical review times in Washington, D.C.

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Washington, D.C. review times

  • Filed Projects (full plan review)30 business days
A planted green roof behind a steel railing on a flat city rooftop
Green Building ActPrivate development of 50,000 square feet or more in D.C. must achieve at least LEED certification.

Documents

Documents usually required

  1. Architectural drawings: floor plans, reflected ceiling plans, elevations, and sections
  2. Structural drawings and calculations where the scope touches structure
  3. MEP drawings, commonly filed as separate trade permits
  4. Life safety and egress plans, with occupant load calculations
  5. Energy compliance documentation, commonly COMcheck for commercial scopes
  6. A recorded plat or survey, and the lease or deed establishing the applicant's standing
  7. Fire protection drawings where sprinkler, standpipe, or alarm work is in scope

Common comments

Why Washington, D.C. permits get sent back

  • Project filed in the wrong review track
  • Missing historic preservation clearance
  • Missing energy and green code documents
  • Pending DDOT, DC Water or WMATA sign-offs
  • Trade work without a licensed master trade

We pre-check every package against the office's requirements before it is filed.

What we deliver

Commercial Permit in Washington, D.C., step by step

  1. Step 1 of 6

    Review map first

    A review map produced before submission: every agency, every approval, and the order they have to happen in

  2. Step 2 of 6

    Sealed permit drawings

    Permit drawings and construction document revisions, sealed by our licensed architects and engineers

  3. Step 3 of 6

    Zoning and use checks

    Zoning and use verification, including overlay districts and form-based code where they apply

  4. Step 4 of 6

    Filing across agencies

    Filing and fee handling across every agency involved, not just the building department

  5. Step 5 of 6

    Comments and resubmissions

    Plan review comment responses, resubmissions, and direct coordination with reviewers

  6. Step 6 of 6

    Inspections to occupancy

    Inspection coordination through to certificate of occupancy

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Washington, D.C.?

Send the address and scope. We'll call within one business day with the Washington, D.C. permit path, a review range and a price.