Residential building permits in Washington, D.C.

D.C. gives homeowners real fast lanes: DOB's Homeowner's Center reviews owner-occupied one- and two-family home projects on a next-business-day SLA, and eligible small projects under 1,000 sq ft qualify for next-day Digital Walk-Through review. The catch: work outside those programs, such as an addition, goes through full filed review on DOB's 30-business-day SLA, and trade permits can only be pulled by licensed master trade professionals.

A row of brick rowhouses along a city street
Homeowner's Center (owner-occupied 1–2 family)Next business dayDigital Walk-Through (eligible scopes under 1,000 sq ft)Next business dayWhere we fileDOB Citizen Access

Local requirements

What Washington, D.C. asks for

  • Homeowner's Center: next-business-day review for owner-occupied 1–2 family homes
  • Digital Walk-Through: next-day review for eligible projects under 1,000 sq ft
  • Historic rowhouse districts clear through staff-level HPO review in most cases
  • Electrical, plumbing, and mechanical permits require licensed master trades

Everything about permits in Washington, D.C.

Review times

Typical review times in Washington, D.C.

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Washington, D.C. review times

  • Homeowner's Center (owner-occupied 1–2 family)Next business day
  • Digital Walk-Through (eligible scopes under 1,000 sq ft)Next business day
A restored porch with carved trim beside a bay window on an old house
Historic districtsHistoric rowhouse districts clear through staff-level HPO review in most cases.

Documents

Documents usually required

  1. A site or plat plan showing the structure, lot lines, and setbacks
  2. Floor plans and elevations for the proposed work
  3. Structural details for anything load-bearing, sealed by a professional engineer where required
  4. Energy compliance worksheets, commonly ResCheck for residential scopes
  5. Proof of ownership or an owner authorization letter if a contractor is filing
  6. Contractor license and, where the jurisdiction requires it, a certificate of insurance

Common comments

Why Washington, D.C. permits get sent back

  • Project filed in the wrong review track
  • Missing historic preservation clearance
  • Missing energy and green code documents
  • Pending DDOT, DC Water or WMATA sign-offs
  • Trade work without a licensed master trade

We pre-check every package against the office's requirements before it is filed.

What we deliver

Residential Permit in Washington, D.C., step by step

  1. Step 1 of 6

    Drawings to the checklist

    Permit drawings prepared to the submitting jurisdiction's checklist, or a review and correction of drawings you already have

  2. Step 2 of 6

    Zoning and setbacks first

    Zoning and setback verification before submission, which is where most residential rejections come from

  3. Step 3 of 6

    Energy compliance

    Energy compliance documentation where the jurisdiction requires it

  4. Step 4 of 6

    Filing and tracking

    Application filing, fee handling, and tracking through the portal

  5. Step 5 of 6

    Every comment answered

    Written responses to every plan review comment, and resubmission until approval

  6. Step 6 of 6

    Inspections to final

    Inspection scheduling and coordination through to final sign-off

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Washington, D.C.?

Send the address and scope. We'll call within one business day with the Washington, D.C. permit path, a review range and a price.