MEP Permits in Montgomery County

Montgomery County MEP permits are separate trade applications with DPS, filed through Apply & ePay alongside the building permit, with plans uploaded to ePlans. Maryland's energy performance standards apply to most mechanical scopes, so HVAC and electrical submissions need energy compliance documentation, a frequent correction-cycle trigger when missing.

A row of mechanical units along the edge of a flat roof
MEP (Mechanical / Electrical / Plumbing)3–6 weeksWhere we fileDPS eServices

Local requirements

What Montgomery County asks for

  • Trade permits filed separately from the building permit through DPS Apply & ePay
  • Energy compliance (ResCheck/COMcheck) documentation required for most MEP scopes
  • Rockville and Gaithersburg are independent cities; their MEP permits go through city offices
  • MEP review typically runs 3–6 weeks; well-documented submissions move fastest

Everything about permits in Montgomery County

Review times

Typical review times in Montgomery County

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Montgomery County review times

  • MEP (Mechanical / Electrical / Plumbing)3–6 weeks
A new utility box and blue pipe on the siding of a house
Energy complianceMost Montgomery County MEP scopes need ResCheck or COMcheck energy documentation, a frequent correction trigger when missing.

Documents

Documents usually required

  1. Mechanical drawings with equipment schedules and duct layouts
  2. Electrical drawings with panel schedules and load calculations
  3. Plumbing drawings with fixture counts and riser diagrams
  4. Energy compliance documentation for the affected systems
  5. Manufacturer cut sheets for specified equipment
  6. Trade contractor licenses for the jurisdiction being filed in

Common comments

Why Montgomery County permits get sent back

  • Missing ResCheck or COMcheck documentation
  • Unstamped drawings where a seal is required
  • Incomplete site plans or setback documentation
  • Scope descriptions that don't match the drawings
  • Open violations needing a Violation Removal Permit

We pre-check every package against the office's requirements before it is filed.

What we deliver

MEP Permits in Montgomery County, step by step

  1. Step 1 of 6

    Engineer-sealed MEP drawings

    MEP drawings prepared and sealed by our licensed professional engineers

  2. Step 2 of 6

    Loads and schedules

    Load calculations and equipment schedules sized to the actual scope

  3. Step 3 of 6

    Energy compliance

    Energy compliance documentation, ResCheck or COMcheck as the scope requires

  4. Step 4 of 6

    Separate trade filings

    Separate trade permit applications filed and tracked per jurisdiction practice

  5. Step 5 of 6

    Kept in sequence

    Coordination so the trade permits and the building permit do not fall out of sequence

  6. Step 6 of 6

    Comments and inspections

    Comment responses and inspection scheduling through final approval

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Montgomery County?

Send the address and scope. We'll call within one business day with the Montgomery County permit path, a review range and a price.