Residential building permits in Montgomery County

Montgomery County DPS takes residential applications through Apply & ePay and plans through ePlans, and eligible small projects (single-level decks, small sheds and similar) can go through Residential Fast Track, generally issued in 1–2 business days. Stamped drawings and Maryland energy compliance documentation are required for most structural work, and properties inside Rockville or Gaithersburg city limits use the city's process instead of DPS.

A brick house with a new two-story addition in pale siding above a green lawn
Residential Addition / Alteration4–10 weeksDeck / Fence / Accessory Structure4–8 weeksWhere we fileDPS eServices

Local requirements

What Montgomery County asks for

  • Residential Fast Track for eligible small projects, generally 1–2 business days
  • ResCheck energy documentation required with most submissions
  • Rockville and Gaithersburg are separate permit jurisdictions
  • Residential additions typically run 4–10 weeks at DPS

Everything about permits in Montgomery County

Review times

Typical review times in Montgomery County

Typical first-review times, last verified August 10, 2026. Actual times depend on the office's queue and on how complete the first submission is. All Montgomery County review times

  • Residential Addition / Alteration4–10 weeks
  • Deck / Fence / Accessory Structure4–8 weeks
A new shed with a deep blue door panel at the edge of a backyard
Fast TrackSingle-level decks, small sheds and similar small projects can go through Residential Fast Track, generally issued in 1–2 business days.

Documents

Documents usually required

  1. A site or plat plan showing the structure, lot lines, and setbacks
  2. Floor plans and elevations for the proposed work
  3. Structural details for anything load-bearing, sealed by a professional engineer where required
  4. Energy compliance worksheets, commonly ResCheck for residential scopes
  5. Proof of ownership or an owner authorization letter if a contractor is filing
  6. Contractor license and, where the jurisdiction requires it, a certificate of insurance

Common comments

Why Montgomery County permits get sent back

  • Missing ResCheck or COMcheck documentation
  • Unstamped drawings where a seal is required
  • Incomplete site plans or setback documentation
  • Scope descriptions that don't match the drawings
  • Open violations needing a Violation Removal Permit

We pre-check every package against the office's requirements before it is filed.

What we deliver

Residential Permit in Montgomery County, step by step

  1. Step 1 of 6

    Drawings to the checklist

    Permit drawings prepared to the submitting jurisdiction's checklist, or a review and correction of drawings you already have

  2. Step 2 of 6

    Zoning and setbacks first

    Zoning and setback verification before submission, which is where most residential rejections come from

  3. Step 3 of 6

    Energy compliance

    Energy compliance documentation where the jurisdiction requires it

  4. Step 4 of 6

    Filing and tracking

    Application filing, fee handling, and tracking through the portal

  5. Step 5 of 6

    Every comment answered

    Written responses to every plan review comment, and resubmission until approval

  6. Step 6 of 6

    Inspections to final

    Inspection scheduling and coordination through to final sign-off

What happens next

  1. Step 1We read your details and check the property's jurisdiction.
  2. Step 2We call you within one business day to ask anything missing.
  3. Step 3You get the permit plan and a written price. You decide.

“Mr. Moshfeq of Permit care is a wonderful person and a with a high degree of professionalism. I would recommend him to anyone who need assistance in securing building permits fast.”

Benson Stephen

Building in Montgomery County?

Send the address and scope. We'll call within one business day with the Montgomery County permit path, a review range and a price.